At Moremac, we aim to leave The Point better than we found it – a better place to live, a better community and better environmentally.
For those of you who have visited us down at The Point, you will see various parts of the project currently under construction. Here are the phases of construction breakdown.
1. Plans and Permits
Council and Authority acceptance of documentation including engineering design to allow physical works to commence on site.
2. Earthworks
Preparation of the site to achieve design lot levels including site scrape, shaping of the existing ground and construction of retaining walls if required.
3. Sewer and Drainage
Installation of sewer and drainage to service the development of the stage.
4. Road boxing, Kerb and Channel
Prepare the ground and start to construct the lower layers of the road pavement. Install water and gas mains and construct kerb and channel.
5. Electrical & Telecommunications
Trench and install electrical and telecommunication services once kerb and channel works are complete.
6. Footpaths and Asphalt
Prepare the ground in readiness to construct footpaths. Construct footpaths and topsoil nature strips. Construction of middle pavement layers and placement of asphalt.
7. Completion and Inspection of Works
Council and Service Authority works inspections and sign off to constructed works including roads and services. Provision of all documentation to Council to facilitate a Statement of Compliance for the development stage.
8. Titles Office and Settlement
Registration of individual lots from each stage occurs at the titles office, and your block is now ready for you to settle & start the construction of your new home. Congratulations!
Moremac Property Group is committed to ensuring purchasers get access to their lots as soon as possible. However, delays may occur due to unforeseen weather conditions or construction setbacks. The above information was provided on the 8th December 2020 – we encourage buyers to check this website for updated information.